MY WORKING EXPERIENCE

VISTALAND & LANDSCAPE INCORPORATED


SITE DEVELOPMENT ENGINEER

  • Site Supervision: Managed multiple contractors to ensure timely completion, quality, and safety, overcoming challenges like labor shortages and material delays.

  • Pre-Construction Phase: Collaborated with local government units (LGUs) and environmental agencies to secure permits and maintain compliance with regulations, including addressing bureaucratic and environmental challenges.

  • Construction Phase: Conducted regular site inspections, coordinated contractor activities, and addressed discrepancies to ensure adherence to contract terms and specifications.

  • Land Management: Oversaw security for raw land, preventing delays caused by theft, trespassing, or land disputes, and resolved issues with informal settlers and tenant claims.

  • Preventive Maintenance: Monitored and maintained raw land to prevent issues such as overgrown vegetation, erosion, and flooding, ensuring continuous project progression.

  • Land Dispute Resolution: Coordinated with local authorities, legal teams, and landowners to resolve disputes with informal settlers and tenants, ensuring compliance with legal standards.


CONSTRUCTION ENGINEER

  • Project Management: Led the complete renovation of office spaces for Master Piece Asia Inc. and Fine Properties Inc., managing projects covering 220 sqm and 180 sqm, respectively.

  • Budget Optimization: Successfully reduced project costs by reviewing contractor bids and identifying areas for cost efficiency without compromising safety or quality.

  • Contractor Coordination: Oversaw coordination with multiple contractors (structural, electrical, plumbing, and MEPFS) to ensure compliance with timelines, quality standards, and safety regulations.

  • Project Documentation: Managed and documented project scope changes, ensuring transparency with clients regarding budget impacts and timeline adjustments.

  • Quality Control: Regularly inspected site works to ensure adherence to design specifications, quality standards, and construction methodologies, addressing any discrepancies during execution.

  • Post-construction Handover: Facilitated a formal turnover process, providing clients with as-built drawings, warranties, maintenance schedules, and a detailed project completion report


PROJECTS


SITE DEVELOPMENT ENGINEER
(2019-2024)

INFRASTRUCTURE


PROPERTY MAINTENANCE

SITE PREPARATION


ABOUT ME

As a site development engineer in general, I manage, oversee, and maintain projects from pre-construction to post-construction phase to ensure the project deliverable will be completed on time and all work complies with the approved plans, standards, and specifications.


LETS WORK TOGETHER

Email: [email protected]